Search results

Search list

Results in:

531-540 of 35,439 results

Methods, construction products and materials for the repair of sewers and drains in non-accessible areas — Part 1: Requirements on materials and methods for repair of drains and sewers

Procedures, Construction Products, and Materials for the Repair of Non-Accessible Sewer Channels – Part 2: Assessment of Conformity for Repair Procedures by Injection

Procedures, Construction Products, and Materials for the Repair of Non-Accessible Sewer Channels and Pipes – Part 3: Repair by Injection

Treatment of water of swimming pools and baths - Part 2: Combinations of process with fixed bed filters and precoat filters; Amendment A1

Treatment of water of swimming pools and baths - Part 3: Combinations of process with ozonization and chlorination; Amendment A1

Project

DIN 19663

Torrent control; terms, planning and construction

Soil quality - Field tests - Part 7: Determination of infiltration rate by double ring infiltrometer

Characterization of solids - Sampling of solid and semi-solid materials - Part 3: Sampling from transport vehicles and of containers, as well as of big-bags

Characterization of solids - Sampling of solid and semi-solid materials - Part 6: In situ sampling, with CD-ROM

Dam plants - Part 10: General specifications

TOP