Search results

Search list

Results in:

1,461-1,470 of 1,475 results
Standards [CURRENT]

UNE-EN ISO 9771

PLASTICS. PHENOLIC RESINS. DETERMINATION OF THE PSEUDO-ADIABATIC TEMPERATURE RISE OF LIQUID RESOLS WHEN CURED UNDER ACID CONDITIONS (ISO 9771:1995).
Edition 1997-12-31

Standards [CURRENT]

SN EN ISO 11298-4

Plastics piping systems for renovation of underground water supply networks - Part 4: Lining with cured-in-place pipes (ISO 11298-4:2021)
Edition 2021-07

Standards [CURRENT]

SN EN ISO 11296-4

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 4: Lining with cured-in-place pipes (ISO 11296-4:2018)
Edition 2018-08

Standards [CURRENT]

SN EN ISO 11297-4

Plastics piping systems for renovation of underground drainage and sewerage networks under pressure - Part 4: Lining with cured-in-place pipes (ISO 11297-4:2018)
Edition 2018-08

Standards [CURRENT]

SN EN ISO 11296-4/A1

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 4: Lining with cured-in-place pipes - Updated definitions, marking requirements and procedure for alternative expression of flexural test results (ISO 11296-4:2018/Amd 1:2021); Amendment A1
Edition 2021-07

Standards [CURRENT]

SN EN 62788-1-6

Measurement procedures for materials used in photovoltaic modules - Part 1-6: Encapsulants - Test methods for determining the degree of cure in Ethylene-Vinyl Acetate
Edition 2017-05

Standards [CURRENT]

ISO 10398

Rubber - Identification of accelerators in cured and uncured compounds
Edition 1998-07

Standards [CURRENT]

ISO 11297-4

Plastics piping systems for renovation of underground drainage and sewerage networks under pressure - Part 4: Lining with cured-in-place pipes
Edition 2018-02

Standards [CURRENT]

ISO 11296-4

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 4: Lining with cured-in-place pipes
Edition 2018-02

Standards [CURRENT]

ISO 11298-4

Plastics piping systems for renovation of underground water supply networks - Part 4: Lining with cured-in-place pipes
Edition 2021-03

TOP