NA 119

DIN Standards Committee Water Practice

Project

Piping systems for rehabilitation of underground drainage, sewerage and water supply networks - Part 2: Thermoset composite materials

Begin

2024-03-20

Planned document number

ISO/CD 11300-2

Responsible national committee

NA 119-05-37 AA - Renovation, repair and replacement of drains and sewers (CEN/TC 165/WG 13, CEN/TC 155/WG 17 and ISO/TC 138/SC 8 with WG 1, WG 2 and WG 7)  

Responsible international committee

ISO/TC 138/SC 8/WG 2 - Systems for rehabilitation of drainage, sewerage and water supply networks  

previous edition(s)

Plastics piping systems for renovation of underground water supply networks - Part 4: Lining with cured-in-place pipes
2021-03

Order from DIN Media

Plastics piping systems for renovation of underground water supply networks - Part 1: General
2018-03

Order from DIN Media

Plastics piping systems for renovation of underground drainage and sewerage networks under pressure - Part 4: Lining with cured-in-place pipes
2018-02

Order from DIN Media

Plastics piping systems for renovation of underground drainage and sewerage networks under pressure - Part 1: General
2018-03

Order from DIN Media

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 4: Lining with cured-in-place pipes - Amendment 1: Updated definitions, marking requirements and procedure for alternative expression of flexural test results
2021-02

Order from DIN Media

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 4: Lining with cured-in-place pipes
2018-02

Order from DIN Media

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 1: General
2018-02

Order from DIN Media

Contact

Natja Böttcher

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2139
Fax: +49 30 2601-42139

Send message to contact