NA 022

DKE German Commission for Electrical, Electronic & Information Technologies of DIN and VDE

Project

Overhead electrical lines exceeding 1 kV - Procedures and equipment for stringing of conductors - Part 105: Swivel couplers

Abstract

This document is applicable to swivel connectors for laying conductors on overhead lines with rated voltages above AC 1 kV according to DIN EN 50341 1 (VDE 0210-1) and DIN EN 50341-2-4 (VDE 0210-2-4).

Begin

2024-11-19

Planned document number

DIN VDE 0212-105

Project number

02232705

Responsible national committee

DKE/K 421 - Freileitungen  

draft standard

Overhead electrical lines exceeding 1 kV - Procedures and equipment for stringing of conductors - Part 105: Swivel couplers
2025-10
Order from DIN Media

previous edition(s)

Overhead lines with nominal voltages exceeding 1 kV - Methods and equipment for the installation of conductors - Part 3: Cable couples with spherical joint
2005-06

Order from DIN Media

Contact

Dipl.-Ing.

Guido Heit

Merianstr. 28
63069 Offenbach am Main

Tel.: +49 170 9118364
Fax: +49 69 6308-9224

Send message to contact