NA 022

DKE German Commission for Electrical, Electronic & Information Technologies of DIN and VDE

Search list

Projects of NA 022

Number: 8,488

Document number Begin Title Comment
IEC 9/1462/CD 2009-02-20 IEC 60349-4 Ed.1: Electric traction - Rotating electrical machines for rail and road vehicles - Part 4: Permanent magnet synchronous motors or generators connected to an electronic converter More  Comment 
IEC 66/441/CDV 2009-02-20 IEC 61010-2-33 Ed 1: Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-033: Particular requirements for hand-held multimeters and other hand-held meters, for domestic and professional use, capable of measuring mains voltage More  Comment 
IEC 96/352/CD 2009-02-20 IEC 61558-2-14 Ed 1: Safety of transformers, reactors, power supply units and combinations thereof - Part 2-14: Particular requirements and test for variable transformers and power supply units incorporating variable transformers More  Comment 
IEC 49/884/CDV 2009-02-20 IEC 61837-2 Ed.2: Surface mounted piezoelectric devices for frequency control and selection - Standard outlines and terminal lead connections - Part 2: Ceramic enclosures More  Comment 
IEC 47A/862/CD 2009-02-20 IEC 62132-6 Ed.1: Integrated circuits - Measurement ofelectromagnetic immunity - Part 6: Local Injection Horn Antenna (LIHA) method More  Comment 
IEC 81/349/CDV 2009-02-20 IEC 62561-5: Lightning Protection System Components (LPSC) - Part 5: Requirements for earth electrode inspection housings and earth electrode seals More  Comment 
IEC 81/350/CDV 2009-02-20 IEC 62561-6: Lightning Protection System Components (LPSC) - Part 6: Requirements for lightning strike counters (LSC) More  Comment 
IEC 9/1248/CDV 2009-02-20 IEC 62621 Ed.1: Railway applications - Fixed installations - Electric traction - Special requirements for composite insulators More  Comment 
IEC 8/1256A/NP 2009-02-20 Comments received on 8/1256/NP: Design and Operation of Interconnected Power Systems More  Comment 
IEC 88/343/DC 2009-02-20 Call for proposals for sections C (System approach aspects), D (Objectives and strategies (3 to 5 years)) and E (Action plan) of the IEC TC 88 STRATEGIC BUSINESS PLAN (SBP) More  Comment 

TOP