• Hydrogen Technologies Norms and standards form the basic framework for market ramp-up

    More information
  • Climate change Standards and specifications support climate targets

    More information
  • Smart Farming Standards and specifications are drivers for the digitalization of agriculture

    More information
Project

Power transformers - Part 4: Guide to the lightning impulse and switching impulse testing - Power transformers and reactors (IEC 14/1060/CD:2020); Text in German and English

Abstract

This part of IEC 60076 gives guidance and explanatory comments on the existing procedures for lightning and switching impulse testing of power transformers to supplement the requirements of IEC 60076-3. It is also generally applicable to the testing of reactors (see IEC 60076-6), modifications to power transformer procedures being indicated where required. Information is given on waveshapes, test circuits including test connections, earthing practices, failure detection methods, test procedures, measuring techniques and interpretation of results. Where applicable, the test techniques are as recommended in IEC 60060-1 and IEC 60060-2.

Begin

2021-05-25

Planned document number

DIN EN 60076-4

Project number

02230295

Responsible national committee

DKE/K 321 - Transformatoren  

draft standard

Power transformers - Part 4: Guide to the lightning impulse and switching impulse testing - Power transformers and reactors (IEC 14/1060/CD:2020); Text in German and English
2023-04
Order from Beuth Verlag

previous edition(s)

Power transformers - Part 4: Guide to lightning impulse and switching impulse testing; Power transformers and reactors (IEC 60076-4:2002); German version EN 60076-4:2002
2003-06

Order from Beuth Verlag

Contact

Dr.

Michael Rudschuck

Merianstraße 28
63069 Offenbach am Main

Tel.: +49 69 6308-266

Send message to contact