NA 052

DIN Standards Committee Road Vehicles and Mobility

Project

Public transport - Reference data model - Part 4: Operations monitoring and control

Abstract

This document incorporates the following main data packages: - Dated Production Components; - Call; - Dated Call; - Production Plan; - Detecting & Monitoring; - Situation; - Messaging; - Control Action; - Operational Event & Incident; - Facility Monitoring & Availability; - Occupancy. It is composed of the following parts: - main document representing the data model for the concepts shared by the different domains covered by Transmodel (normative); - Annex A containing the data dictionary and attribute tables, i.e. the list of all the concepts presented in the main document together with their definitions (normative); - Annex B presenting the model evolution (informative); - Annex C detailing the mapping to DATEX-II and SIRI (informative). - Annex D, providing details of the significant technical changes between this document and EN 12896 4:2019 (informative).

Begin

2024-06-11

WI

00278641

Planned document number

prEN 12896-4

Responsible national committee

NA 052-00-71-03 GAK - Joint working group NAAutomobil/DKE/FSF: Public transport  

Responsible european committee

CEN/TC 278/WG 3 - Public transport (PT)  

draft standard

Public transport - Reference data model - Part 4: Operations monitoring and control
2025-11
Order from DIN Media

previous edition(s)

Public transport - Reference data model - Part 4: Operations monitoring and control
2019-09

Order from DIN Media

Contact

Eric Wern

Behrenstr. 35
10117 Berlin

Tel.: +49 30 897842-323

Send message to contact