Search results

Search list

Results in:

1-10 of 118 results

Wire ropes, rope terminations and wire rope slings

Safety requirements for cableway installations designed to carry persons - Carriers - Part 1: Grips, carrier trucks, on-board brakes, cabins, chairs, carriages, maintenance carriers, tow-hangers

Safety requirements for cableway installations designed to carry persons - Carriers - Part 1: Grips, carrier trucks, on-board brakes, cabins, chairs, carriages, maintenance carriers, tow-hangers

Energy performance of lifts, escalators and moving walks - Part 2: Energy calculation and classification for lifts (elevators)

Energy performance of lifts, escalators and moving walks - Part 2: Energy calculation and classification for lifts (elevators)

Safety rules for the construction and installation of lifts - Lifts for the transport of goods only - Part 30: Electric and hydraulic service lifts; German version EN 81-30:2025

Safety rules for the construction and installation of lifts - Lifts for the transport of goods only - Part 31: Accessible goods only lifts; German version EN 81-31:2024

Project

DIN 5644-2

Urban Rail – Requirements for Urban Rail Tracks - Part 2: Track alignment

Transportable wall saw and wire saw equipment for job site - Safety

Fibre ropes - High modulus polyethylene - 8-strand braided ropes, 12-strand braided ropes and covered ropes

TOP