Search results
Search list
Results in:
IEC 57/1108/NP
Draft IEC 61970-552: Energy Management System Application Program Interface (EMS-API): ) - Part 552: CIM XML Model Exchange Forma
IEC 57/1109/FDIS
IEC 61850-8-1 Ed.2: Communication networks and systems for power utility automation - Part 8-1: Specific Communication Service Mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 57/1110/CDV
IEC 61968-1 Ed.2: Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general requirements
IEC 57/1112/NP
Communication network structure in hydropower plants (proposed IEC 61850-90-410 TS Ed.1)
IEC 57/1113/CD
IEC 62325-450 Ed.1: Framework for energy market communications - Part 450: Profile and context modelling rules
IEC 57/1114/NP
Common Information Model (CIM) extension for generation
IEC 57/1115/NP
Interoperability test for hydro equipments based on IEC 61850
IEC 57/1116/RR
Review Report on IEC 61850-5 Ed.1: Communication Networks and Systems for in substations - Part 5: Communication Requirements for Functions and Device Models
IEC 57/1117/NP
System interfaces and communication protocol profiles relevant for systems connected to the Smart Grid
IEC 57/1118/NP
Power systems management and associated information exchange - Data and communications security - Part 9: Cyber security key management for power system equipment (Future IEC 62351-9 TS Ed.1)