Search results
Search list
Results in:
IEC 57/1090/DC
Draft IEC/TR 61850-1 Ed.2: Communication networks and systems for power utility automation - Part 1: Introduction and overview
IEC 57/1091/CDV
IEC 61850-7-410 Ed.2: Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control
IEC 57/1093/DC
Draft IEC TR 61850-7-510: Communication networks and systems for power utility automation - Part 7-510: Hydroelectric power plants - Modelling concepts and guidelines (developed by WG 18: Hydropower plants, communication for monitoring and control)
IEC 57/1099/CDV
IEC 61970-456 Ed.1: Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles
IEC 57/1103/FDIS
IEC 61850-4 Ed.2: Communication networks and systems for power utility automation - Part 4: System and project management
IEC 57/1107/NP
Draft IEC 61970-452: Energy Management System Application Program Interface (EMS-API) - Part 452: CIM Static Transmission Network Model Profile
IEC 57/1108/NP
Draft IEC 61970-552: Energy Management System Application Program Interface (EMS-API): ) - Part 552: CIM XML Model Exchange Forma
IEC 57/1109/FDIS
IEC 61850-8-1 Ed.2: Communication networks and systems for power utility automation - Part 8-1: Specific Communication Service Mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 57/1110/CDV
IEC 61968-1 Ed.2: Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general requirements
IEC 57/1112/NP
Communication network structure in hydropower plants (proposed IEC 61850-90-410 TS Ed.1)