Search results

Search list

Results in:

11,041-11,050 of 35,386 results

Draft IEC/TR 61850-1 Ed.2: Communication networks and systems for power utility automation - Part 1: Introduction and overview

IEC 61850-7-410 Ed.2: Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control

Draft IEC TR 61850-7-510: Communication networks and systems for power utility automation - Part 7-510: Hydroelectric power plants - Modelling concepts and guidelines (developed by WG 18: Hydropower plants, communication for monitoring and control)

IEC 61970-456 Ed.1: Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles

IEC 61850-4 Ed.2: Communication networks and systems for power utility automation - Part 4: System and project management

Draft IEC 61970-452: Energy Management System Application Program Interface (EMS-API) - Part 452: CIM Static Transmission Network Model Profile

Draft IEC 61970-552: Energy Management System Application Program Interface (EMS-API): ) - Part 552: CIM XML Model Exchange Forma

IEC 61850-8-1 Ed.2: Communication networks and systems for power utility automation - Part 8-1: Specific Communication Service Mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3

IEC 61968-1 Ed.2: Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general requirements

Communication network structure in hydropower plants (proposed IEC 61850-90-410 TS Ed.1)

TOP