Search results
Search list
Results in:
JIS K 5600-7-4
Testing methods for paints - Part 7: Long-period performance of film - Section 4: Humidity and cool-heat cycling test
Edition
1999-05-31
JIS K 5600-7-8
Testing methods for paints - Part 7: Long-period performance of film - Section 8: Accelerated weathering (Exposure to fluorescent UV lamps)
Edition
1999-05-31
BS ISO 24688
Determination of modulation period of nano-multilayer coatings by low-angle X-ray methods
Edition
2022-08-15
JIS K 5600-7-7
Testing methods for paints - Part 7: Long-period performance of film - Section 7: Accelerated weathering and exposure to artificial radiation (Exposure to filtered xenon-arc radiation)
Edition
2008-02-20
ABNT NBR 14478
Gasoline - Determination of oxidation stability by induction period method
Edition
2009-09-23
UNE 51203
OXIDATION STABILITY OF GASOLINE. INDUCTION PERIOD METHOD
Edition
1987-06-15
UNE-EN 13286-45
Unbound and hydraulically bound mixtures - Part 45: Test method for the determination of the workability period of hydraulically bound mixtures
Edition
2004-05-28
UNE-EN 16144
Liquid petroleum products - Determination of ignition delay and derived cetane number (DCN) of middle distillate fuels - Fixed range injection period, constant volume combustion chamber method
Edition
2012-06-27
UNE 41240
Cement treated materials. Test methods. Determination of the workability period.
Edition
2003-05-14
PD ISO/TR 19244
Guidance on transition periods for standards developed by ISO/TC 84. Devices for administration of medicinal products and catheters
Edition
2014-08-31