NA 082

DIN Standards Committee Piping and Boiler Plant

Project

Shell boilers - Part 6: Requirements for equipment for the boiler; German and English version prEN 12953-6:2023

Abstract

This document specifies the minimum requirements for safety related equipment for shell boilers (generator and/or assemblies) as specified in EN 12953-1:2012, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be automatically interrupted and locked out, irrespective of the degree of intervention. NOTE 1 For this European Standard, the term "boiler" is applicable for generator and/or assemblies. NOTE 2 The maximum time of operation without manual (human) intervention can be specified for each boiler system. NOTE 3 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 24 hours and 72 hours.

Begin

2021-11-23

WI

00269067

Planned document number

DIN EN 12953-6

Project number

08201439

Responsible national committee

NA 082-00-18 AA - Boiler plants  

Responsible european committee

CEN/TC 269/WG 2 - Shell boilers  

draft standard

Shell boilers - Part 6: Requirements for equipment for the boiler; German and English version prEN 12953-6:2023
2023-07
Order from DIN Media

previous edition(s)

Shell boilers - Part 6: Requirements for equipment for the boiler; German version EN 12953-6:2011
2011-05

Order from DIN Media

Contact

Thu Trang Bähr

Am DIN-Platz, Burggrafenstr. 6
10787 Berlin

Tel.: +49 30 2601-2196
Fax: +49 30 2601-42196

Send message to contact